Fayetteville West Transmission Main Pipeline
Erosion control North Texas
HIGHLIGHTS
- Contractor: Garney Companies, Inc.
- Location: Fayetteville, Arkansas
- Pipeline: 48” diameter steel water transmission main, 11.3 miles long
PROJECT OVERVIEW
Greenrise is proud to support Garney Companies on the Fayetteville West Transmission Main Pipeline Project, a critical 48-inch steel water transmission main stretching more than 11 miles from Fayetteville westward and north toward Elm Springs. As a leader in erosion control solutions in North Texas, we bring proven expertise to safeguard natural resources and meet strict compliance standards.
This large-scale infrastructure project involves:
- Installation of erosion and sediment controls
- Utility relocations, demolition, and vegetation removal within the right of way
- Excavation, stockpiling, filling, and grading for pipe installation
- Concrete and asphalt work for driveways, road crossings, and utilities
- Final stabilization and removal of temporary BMPs
Our North Texas team is leading the erosion control and compliance scope for the project, including:
- Development of the SWPPP and erosion control plan set
- Ongoing site inspections and permit management
- Coordination of erosion control measures to ensure environmental protection and compliance