Fayetteville West Transmission Main Pipeline

Erosion control North Texas

HIGHLIGHTS

  • Contractor: Garney Companies, Inc.​
  • Location: Fayetteville, Arkansas​
  • Pipeline: 48” diameter steel water transmission main, 11.3 miles long​

PROJECT OVERVIEW

Greenrise is proud to support Garney Companies on the Fayetteville West Transmission Main Pipeline Project, a critical 48-inch steel water transmission main stretching more than 11 miles from Fayetteville westward and north toward Elm Springs. As a leader in erosion control solutions in North Texas, we bring proven expertise to safeguard natural resources and meet strict compliance standards.

 

This large-scale infrastructure project involves:

  • Installation of erosion and sediment controls
  • Utility relocations, demolition, and vegetation removal within the right of way
  • Excavation, stockpiling, filling, and grading for pipe installation
  • Concrete and asphalt work for driveways, road crossings, and utilities
  • Final stabilization and removal of temporary BMPs

 

Our North Texas team is leading the erosion control and compliance scope for the project, including:

  • Development of the SWPPP and erosion control plan set
  • Ongoing site inspections and permit management
  • Coordination of erosion control measures to ensure environmental protection and compliance

Have a Project with Similar Challenges?

We are here to help you come up with a solution that solves your challenge. Contact us today to discuss your project.