Graceland Solar Construction
Solar construction SWPPP services
HIGHLIGHTS
-
Installed over 1,100 acres of seed and straw, providing rapid stabilization across extensive disturbed areas
-
Installed 150,000+ linear feet of silt fence for perimeter and interior sediment control
-
Performed monthly SWPPP inspections, conducted quarterly site assessments, and completed water quality sampling
PROJECT OVERVIEW
Graceland Solar is a large-scale renewable energy project located in Millington, Tennessee. Throughout the project lifecycle, our team provided erosion control, site stabilization, and environmental compliance services to support construction progress while meeting regulatory requirements.
From early site disturbance through ongoing development, our work ensured the project remained compliant, protected surrounding waterways, and stayed on schedule.
SCOPE OF WORK & KEY ACCOMPLISHMENTS
Our team delivered erosion control and environmental compliance services at a scale aligned with the size and complexity of the Graceland Solar project, including:
- Large-scale seeding and mulching for site stabilization
- Installation and maintenance of sediment control measures
- Ongoing SWPPP inspections and compliance documentation
- Environmental monitoring and reporting to meet regulatory standards
PARTNERS
- EPC Contractor: Wanzek Construction
- General Contractor: MasTec Infrastructure Construction
PROJECT IMPACT
Our proactive and consistent approach to erosion control and environmental compliance helped maintain permit compliance, protect nearby waterways, and support uninterrupted construction activities.
The scale and duration of work performed at Graceland Solar demonstrate our ability to successfully execute complex, multi-phase projects while meeting stringent environmental standards—without slowing down the build.